Elk River Hillside Park trail work day: Sunday November 2. 9 AM - 1 PM ride afterward.
Work to be completed as possible
Section 4 - Fill two downhills, one by road & one on south side of Hilltop
Section 3 - Reroute downhill that was rocked this past spring
Section 2 - Replace rock & fill downhill previously filled
Section 1- Berm downhill on north side of ridge
BLAST will bring wheelbarrows, four wheeler & trailers.
Individuals should bring work gloves & shovel.
Thanks,
Kevin
Elk River Hillside Park trail work day: Sunday November 2. 9 AM - 1 PM ride afterward.
Work to be completed as possible
Section 4 - Fill two downhills, one by road & one on south side of Hilltop
Section 3 - Reroute downhill that was rocked this past spring
Section 2 - Replace rock & fill downhill previously filled
Section 1- Berm downhill on north side of ridge
BLAST will bring wheelbarrows, four wheeler & trailers.
Individuals should bring work gloves & shovel.
Thanks,
Kevin