gopherhockey
05-25-2008, 05:02 PM
Here is Leb as it will look after this years trailwork. Areas in pink are the two new sections that we will open this year. (Note that the x out is not labeled as I did not ride that section but went straight into the XX and then out the intermediate bypass.)
As posted elsewhere, the distance of this route will go from 7.25 miles to appx. 8.30 miles. We have another mile or so of trail already approved beyond what this shows, which should bring us to around 9.5 miles of one-way biking only singletrack open all year round. (and I'm sure more to come after that..)
http://www.morcmtb.org/photopost/data/513/LebEstimateLabeled.jpg
This was done with a Garmin Edge 305, so accuracy is not real great, perhaps to 15 feet in some areas. The new trail going around the lake is actually closer on the right side than it shows. The 100' boardwalks will be placed to the north and south of the lake as it crosses the low lying areas.
The smaller new section is in the area we call the "upper bypass". It will be a small re-alignment helping fix some flow issues. This is the highest point of the entire park.
As posted elsewhere, the distance of this route will go from 7.25 miles to appx. 8.30 miles. We have another mile or so of trail already approved beyond what this shows, which should bring us to around 9.5 miles of one-way biking only singletrack open all year round. (and I'm sure more to come after that..)
http://www.morcmtb.org/photopost/data/513/LebEstimateLabeled.jpg
This was done with a Garmin Edge 305, so accuracy is not real great, perhaps to 15 feet in some areas. The new trail going around the lake is actually closer on the right side than it shows. The 100' boardwalks will be placed to the north and south of the lake as it crosses the low lying areas.
The smaller new section is in the area we call the "upper bypass". It will be a small re-alignment helping fix some flow issues. This is the highest point of the entire park.