RichZilla
04-25-2008, 07:51 PM
We are still having the trailwork session this weekend at Hillside Park in Elk River. Both days, starting at 8am. It's going to be too wet to ride the trail on Saturday, but we should be able to get some hits on the new freeride line yet to be built. Gotta test it while ya build it to make sure the transitions are all proper! It looks like there could be some precipitation for tomorrow, so bring some water-proof clothing, jacket mainly. It will be chilly too.
We still have plenty of work that can be done, so still come out if you can. We will be doing much more cutting of new trail, instead of the repairs. The dirt will be too muddy to work with for the repairs. Nix the leafblowers, the leaves will be too wet to blow off the trail. We will be needing many bodies to rake and trim, so bring the loppers, cutters, and rakes. We would like to get two new freeride lines open, plus the entire Section One loop of the new Beginner trail.
Here's the link to the original thread for more info:
http://www.morcmtb.org/forums/showthread.php?t=25933
Thanks!
See y'all tomorrow!
We still have plenty of work that can be done, so still come out if you can. We will be doing much more cutting of new trail, instead of the repairs. The dirt will be too muddy to work with for the repairs. Nix the leafblowers, the leaves will be too wet to blow off the trail. We will be needing many bodies to rake and trim, so bring the loppers, cutters, and rakes. We would like to get two new freeride lines open, plus the entire Section One loop of the new Beginner trail.
Here's the link to the original thread for more info:
http://www.morcmtb.org/forums/showthread.php?t=25933
Thanks!
See y'all tomorrow!