PDA

View Full Version : Terrace Trail work 7/18


nigel
07-17-2006, 10:47 AM
Trail work at 6pm in the main lot. We will be tilling up the singletrack re-routed areas to make em easier to reclaim. Soil should be delivered soon, ill post up when its ready for some crazy shovel action.

D

LightWeight
07-17-2006, 11:54 AM
May be able to make it tomorrow. Having a group outing at work but should be able to leave in time to help ya out.

nigel
07-18-2006, 09:37 AM
Soil will be dropped off today! Reclamation will be going on, so bring yer dirt footwear and lets get dirty. We'll split up into 2 crews if we have enough people, otherwise we'll reclaim the main hill that needs it and seed the singletrack next week. along with some signage.

See ya around 530-6

D

Aberrix
07-18-2006, 02:15 PM
Will you be doing any trimming? I rode it last night and a couple area's seemed a bit overgrown.

nigel
07-18-2006, 02:17 PM
Which spots were bad? We got most of it, but with the off an on again rain im sure things have grownback. If we have enough people we can send 1-2 off with trimming equipment. Moving soil is #1 on the list tonight though. If you wanna come on out at 6 and do some trimming, i'll let ya :crazy:

D

Aberrix
07-18-2006, 02:25 PM
Which spots were bad?

I think it was in the X trail? it was just 2 or 3 places it was noticably bothersome.

If you wanna come on out at 6 and do some trimming, i'll let ya

If it were last night or tomorrow night, I would totally be there... but alas tonight I cannot. Sorry :/

nigel
07-18-2006, 10:19 PM
Big thanks to TED F (slothlike) for helping me out tonight moving soil over and down the old uphill. We were able to get the lower half matted, soiled, seeded and covered with deadfall for a complete reclamation of that section.

Next week we'll work the top half, the following week will be the singletrack and signage.

D