soupboy
10-25-2004, 09:02 AM
for the work done at the RB on the east side. Looks like only two bridges are left to be installed. Love the reroute. Will be a blast once things firm up.
Yesterday as a great day to SS the RB. Still waiting for a quasi permanent solution to the 9 Mile crossing. Seems like all user groups should want that. My thought is a permanent, elevated bridge structure with adjustable ramps to account for changes in elevation to the flood plain.
That, or a zip line...
Sean
Yesterday as a great day to SS the RB. Still waiting for a quasi permanent solution to the 9 Mile crossing. Seems like all user groups should want that. My thought is a permanent, elevated bridge structure with adjustable ramps to account for changes in elevation to the flood plain.
That, or a zip line...
Sean